Boxer 2-leaf

Boxer ISM Integrated door closer system for double leaf doors with closing sequence control

Door closer Boxer ISM Integrated door closer system for double leaf doors with closing sequence control and electric hold-open device
  • System comprising two Boxer door closers and ISM guide rail
  • Closing force with variable adjustment of EN 2-4 or EN 3-6
  • Can be used for right and left hand doors without conversion
  • Door closer is embedded in the door leaf and frame and fulfils the highest design demands
  • Closing sequence control holds the active leaf in the waiting position until the passive leaf is closed
  • Hydraulic latching action which accelerates the door shortly before it is closed
  • Closing speed can be individually adjusted
  • Integrated back check, slows down doors that are thrown open forcefully
  • All functions can be adjusted in the installed state
Buy now

Application Areas

  • Fire and smoke protection doors, proof of suitability for the door required
  • Double leaf single-action doors
  • Single-action doors up to 2800 mm hinge clearance and 1400 mm leaf width, for door weights up to 180 kg
  • Minimum hinge clearance 1300 mm, minimum width of passive leaf 540 mm
  • For door leaf thicknesses from 40 mm
  • Integrated installation

Technical data

Boxer ISM
Closing force in accordance with EN 1154 EN 2 - 6
Barrier-free in accordance with DIN 18040 up to leaf width (max.) in mm 1100 mm
Leaf width (max.) 1400 mm
Leaf weight (max.) 180 kg
Type of installation Concealed
Opening angle (max.) 120 °
Minimum hinge clearance 1300 mm
Minimum passive leaf width 540 mm
Suitability for fire protection doors Yes
Closing force adjustable Yes, stepless
Adjustable closing speed Yes
Latching action adjustable Yes, via valve
Back check integrated Yes, hydraulically adjustable
Position of closing force adjustment Top
Hold-open function Optional
Hold-open device on the active leaf / passive leaf Optional / Optional
Closing sequence control integrated Yes

Downloads

Product shot

Supplementary sheet

Installation situation

Tender texts

Declarations of performance

Installation instructions

Product brochure

Environmental declaration

Installation drawing

Cable plan

Product data sheet

Contact

We would be happy to assist you +49-7152-203-0 Mo - Th: 7.30 a.m. - 5.00 p.m. / Fr: 7.30 a.m. - 4.00 p.m. Architects/Modernization +49-7152-9233-900 Service Hotline +49-1802-923392 (0.06 € / Calling from landline, mobile telephony max. 0.42 €)